Briefings and reports

Final Report

The final report on the trial can be downloaded here.

Please note that the final report is a large file and therefore may take a while to download. If you would like to order a hardcopy of this report please call us for pricing on 01926 312159.

Interim Reports

The fourth interim report on the trial (August 2008) can be downloaded here. This includes analysis of data and a status report for each turbine at the time of writing.

The third interim report on the trial (May 2008) can be downloaded here. This includes analysis of data and a status report for each turbine at the time of writing.

A report of the social and market aspects of the Warwick Wind Trials Project, published in April 2008 can be downloaded here.

The second interim report on the trial (January 2008) can be downloaded here. This includes analysis of data and a status report for each turbine at the time of writing.

The first interim report on the trial (March 2007) can be downloaded here. This covers the first 9 months of activity including planning and installation experience.

Open Days

Summary presentations from the open day on September 9th 2008:

The practical realities of microwind power - Matthew Rhodes, Encraft Ltd

Data and analysis from all sites since November 2007 - Helen Brown, Encraft Ltd

Practical challenges of building mounted wind turbines - David Hailes, Encraft Ltd

Microwind: The national perspective and EST field trials - Jaryn Bradford, Energy Saving Trust

Summary presentations from the open day on December 11th 2007:

Trials overview - Matthew Rhodes, Encraft Ltd

Academic research - Dr Simon Watson, CREST, Loughborough University

Evolving microwind standards - David Sharman, Chair BWEA Small Wind Technical Committee

Initial findings from the Warwick Wind Trials - David Hailes, Encraft Ltd